Just got back shopping, decided to pass on the flooring for now, even with the reduced cost. I just got to much stuff going on. I came back with a truck load of bagged cement, hoe's, wheel barrow, rebar, underground PVC and wiring. Whew, I already got a full plate. Looks like some serious ditch digging comin' up next.
I must be getting old, lifting those 80 lb bags of cement kicked my butt hard by the time I got the truck loaded.
