LoBelly,
I was not suggesting that at all, it just seems he is redoing stuff that could have been done right/better the first time.
Building the Daytona ( ok signing cheques

) there are things like wiring/interior/wheels and stuff that dont need to be done twice.
Nothing more frustrating doing things again, these things take long enough to do without doubling up.
STIFFY