Thread: New Build
View Single Post
  #113 (permalink)  
Old 08-06-2013, 03:37 PM
Cobra01 Cobra01 is offline
CC Member
Visit my Photo Gallery

 
Join Date: Feb 2013
Location: Ormiston, QLD
Cobra Make, Engine: Absolute Pace 427 SC
Posts: 461
Not Ranked     
Default

Hi Tonus

Spent last 10 days at the Absolute Pace facility where the hinges and gas struts are being fitted to the Boot and Bonnet.

When I left on monday afternoon Steve the Composite guy was finishing off the moulds for the doors with the intrusion bars in the doors so that will take a few days to complete.

I still have trouble getting my head around this fiberglass mould thing , It seems you have to be able to work in the negative or something.

I am thinking the end of next week all the body fitment will be finished and I am having a small mod the the cabin of the car but no piccies yet .

Its back to work tomorrow getting deodorant for the taxi drivers and all the things that make the base run well

Cheere

Brad
__________________
There is nothing better than a cold beer
Reply With Quote