More important than ceiling make sure you have enough thickness for the base and correct cement.

Mohawk makes a stout unit.
For my own peace of mind, I would be saw cutting the slab at the anchoring locations. Around 18-24" square and then digging a footing and installing anchor bolts (J-bolts) in the footing along with some minimum 3,000 psi concrete. You can just use a piece of plywood as a template and drill holes to hold the anchor bolts in the correct position while pouring the mud.