Not Ranked
dash time
2-3 hours tops....
the most work came from putting all the pegs on the edges. 116 of them
The second most labor intensive part was installing the gages/switches etc.
Its one of those let someone else do it or you do it jobs.
I like it because it looks good and I can say I DID IT.
Door panels are next, but I can't sew the part I want sewn so I farm that out, the outer pockets.
Tim
|