View Single Post
  #31 (permalink)  
Old 03-31-2016, 05:57 PM
400TT's Avatar
400TT 400TT is offline
CC Member
Visit my Photo Gallery

 
Join Date: Jan 2004
Location: Gold Coast, AUS
Cobra Make, Engine: Wish I had my own PACE 427
Posts: 2,145
Not Ranked     
Default

Quote:
Originally Posted by Zedn View Post
There's no goose chase, it's what's in the ADR for a level 2 warning.
I believe there is a goose to chase. When a new ADR comes out, it is not automatically adopted for ICV's.

Has RMS confirmed in writing to your engineer that ADR 4/05 is required for ICV's? If so, when was it adopted and what sections of 4/05 are required? No other states I know of have adopted ADR 4/05 for ICV's. 4/05 has been around for a while, so states have had plenty of time to adopt it if they wanted. I also don't know of a NSW ICV that has been required to meet ADR 4/05, this is the first I have heard of it.
__________________
www.absolutepace.com
Reply With Quote