View Single Post
  #21 (permalink)  
Old 08-02-2016, 04:54 AM
Jaydee Jaydee is offline
CC Member
Visit my Photo Gallery

 
Join Date: Jun 2012
Location: Naracoorte, SA
Cobra Make, Engine: CR Cobra 3169
Posts: 818
Not Ranked     
Default

Even if you concrete isn't thick enough, all you have to do is run a triangle brace from the top of the hoist post to the sheds c section. That would relief a lot of pressure from the base.
JD
Reply With Quote