Not Ranked
Another quick update for those who still may have interest. It's taking longer than I had hoped (of course) but progress still being made.
A very big bad FE is now installed in the car along with the trans, etc. Headers, etc are on. Electrical is about 80% done. The punch list is getting shorter, things remaining include hooking up the cooling and fuel systems, installing dash and finishing electrical, re-doing the terrible seat upholstery job that I paid an arm and a leg for way back when (he did a terrible job, using someone different this time), carpeting and door panels, build and install driveshaft, fill brake system and bleed, and many smaller jobs. I had hoped to have it done by September, but obviously that didn't happen. I think Spring completion is doable.
The beat goes on........
Edit - I tried to attach a photo as some had asked earlier. It attached sideways. I have no idea how to fix that or make it smaller. Sorry 'bout that.
Last edited by 767Jockey; 12-30-2017 at 10:02 AM..
|