I placed my initial deposit for an ERA slabside (#3018) in April, 2017. Just got notified chassis is on the jig, and the body is already done. Sent second deposit last Friday. Given the powder coating, body bonding, ship out for paint, and assembly of the rest of the ERA installed parts, I expect to have it in my garage by the end of the year, with the rest up to me. So, from first deposit to expected delivery, about 20 months or so. And that's assuming no glitches along the way, or a bottleneck at the paint booth. Could easily stretch out to two years. But in my case, I don't care about the wait.
|