Thanks Jim.
I now have a functioning Ebrake. The cables run under the diagonal bars in the rear. I'll zip tie them to the bars.
I've finished installing the headers and side pipes. I'm using readily available and inexpensive parts. Patriot Vortec truck headers connected to a 90 into the Patriot side pipes.
The fuel tank is mounted and as of tonight I have the fuel line run. The tank is a standard Hot Rod tank from Speedway. I made sure that the body can be mounted while the tank is installed. And, I made sure that the tank can be removed with out removing the body.