Not Ranked
The garage floor I covered had been poured last September, although I just closed on the house at the end of April.
I can't remember how long the slab is supposed to cure before using UCoat-it - did you check with them? I thought it was 90 days, but maybe it was 30, I can't remember.
I won't make the DVSF this year - I'm just now moving into my house and I've got months of stuff I'll need to do it (landscaping, installing 4 post lift, installing the home theater, etc. etc. etc.).
|