Thread: UAW On Strike
View Single Post
  #6 (permalink)  
Old 02-26-2008, 06:15 AM
Silverback51's Avatar
Silverback51 Silverback51 is offline
Senior Club Cobra Member
Visit my Photo Gallery

 
Join Date: Jun 2007
Location: Covington, wa
Cobra Make, Engine: Superformance # 532, 466 BB, 560HP
Posts: 3,029
Not Ranked     
Default

Quote:
Originally Posted by Joe Wicked View Post
Yea, but at $70/hour, they could still afford the products with a $14/hour cut. Come on, $70/hour is $145,000/year to build axles. It is not rocket science.
I'm in a hurry, but I did not read that their wages was $70.00/hour. Where was that?

Did that $70.00/hour include all of their benefits? I can believe that, but I find it hard to believe that their take home wages is $70.00/hour.

And if it is, I have to agree, that is on the high side for what is required of the job.
Reply With Quote