Thread: Air Force Test
View Single Post
  #8 (permalink)  
Old 05-02-2008, 10:54 AM
Joe Wicked's Avatar
Joe Wicked Joe Wicked is offline
CC Member
Visit my Photo Gallery

 
Join Date: Aug 2007
Location: Lavon, TX
Cobra Make, Engine:
Posts: 3,008
Send a message via Yahoo to Joe Wicked
Not Ranked     
Default

Oh I am sure it can, and I know it will. I am waiting for the catastrophic failure of the $125K RF welders due to the table not being aligned properly. After getting yelled at for not going to help (I was never told that they were starting) and then when I did go, getting insulted (I am already doing this, what the f*** are you even doing here). I told them to kiss my a** and walked off. I am the guy who was given the project of getting the equipment here and setup with no training and no help with a 1 week time frame. I got it done, got them running, and got the training I needed. After that, it was assigned to someone else and they got all the credit. Now that they are moving them, it all needs to be aligned again, but that is OK, until the production line is stopped while we wait for parts. Now that person thinks he knows it all, so I will let it fail. When they come to me, I will politely point them at him to fix it.
__________________
Why do they call it "Common Sense" when it is so rare?
Reply With Quote