View Single Post
  #8 (permalink)  
Old 06-02-2009, 01:15 AM
Mando's Avatar
Mando Mando is offline
CC Member
Visit my Photo Gallery

 
Join Date: Jul 2004
Cobra Make, Engine: 347 Stroker Morrison Injection. Registered.
Posts: 1,440
Not Ranked     
Default

Hi Boxhead, Im hoping to start the car within the next 6 weeks if everything goes well.
Tenrocca, my wiring looks neat because I didnt do it.
Sambo, the black box is the delay circuit for the seatbelt sign. I dont know how long it needs to stay on to meet ADRs but my choices start at 3 seconds with the next choice being 15 seconds.

Regards.
__________________
Mando
Reply With Quote