View Single Post
  #8 (permalink)  
Old 06-03-2009, 03:02 PM
WarrenG WarrenG is offline
CC Member
Visit my Photo Gallery

 
Join Date: Jul 2006
Location: Darnestown, MD
Cobra Make, Engine: ERA 289FIA, 289 stroked to 331, 392 HP
Posts: 478
Not Ranked     
Default

Quote:
Originally Posted by trularin View Post
I think I posted it on the other thread I started. So, yes Red, there is a contract. There is a little clause in it that says Kelly can change whatever they want ( basically ).

When I was signing it, I asked what the point of having the contract was if they can change it at will. They gave me some song and dance saying it was their standard paperwork.

The point is, that once they have you on contract the one thing they won't change is that whoever they place you with cannot hire you direct without paying a big finder's fee. Also, in most of those contracts you can't go direct until you've been at the job for at least 6 months or an even bigger finder's fee is required!
Reply With Quote