When I designed the electrical, I had a rather large number of "accessories", but as I taxied the system ( and my patients ), I found that I was cutting item from the list.
Later I added a lot of the items, but if I had been more patient at the wiring stage, I would have had it all in then.
The other one is high beam control in the column.
