Not Ranked
Sorry to hear about that Scott. I know when i get a chance I watch this show on discovery called swamp loggers. probably 30 times during the show they say he needs 18-20 loads per day in order to break even. between mills closing and such for the day, i think the most i have seen is 1 day they made 17, but more often than not they're pulling 5, 2, 7... and everytime I think... well if 18-20 is what he needs to break even..... oh boy! Then equipment breaking down, and this and that and I think wow... it's really getting bad back there!
Good luck, hope things pick back up soon!
__________________
 Bagram AF Afghanistan
|