The rough out is about 2/3rds done. Maybe by Friday we'll be looking at all of the panels being roughed into shape. Next step is to begin stepping in gutters for hood, doors, and trunk and detailing all the shapes before welding.
Last edited by ThePanelbeater; 04-09-2012 at 07:12 PM..