
simon clemens
Mon June 6, 2005 8:36am
|
Dash- Tunnel
Aluminium dash & tunnel fabricated by me. The whole unit is tapped and bolted into place with 6mm bolts, & its easily removable.
|
|

cobrajeff
Fri September 16, 2005 2:24pm Rating: 10
|
Windshield brace
Windshield brace I had fabricated for my car.
|
|

simon clemens
Mon October 31, 2005 6:15am
|
Fuel Filler Neck Complete
Custom fabricated aluminium filler neck, constructed from old bull bar sections. Will be pollished at a later date. Pressure tested with no leaks.
|
|

simon clemens
Mon October 31, 2005 6:15am Rating: 10
|
Fuel Filler Neck Fabrication
Custom fabricated aluminium filler neck, constructed from old bull bar sections.
|
|

olblue66
Thu February 9, 2006 4:55pm
|
P1020260
fabricated shroud
|
|

Hemphill
Sat October 21, 2006 4:47pm Rating: 10
|
Vortec Supercharged 460
Custom fabricated blower bracket for factory stock look.
|
|

KarlCSX2498
Sat April 7, 2007 4:59am Rating: 10
|
HPIM0588
Test fit Wilwood Dynalite caliper on CSX4000, shop fabricated steel caliper bracket.
|
|

Terry1
Sun August 19, 2007 3:32pm Rating: 1
|
IRS - Upper Control Arm
Fabricated clevis for 10% shorter, adjustable upper control arm for T-bird IRS - compared to stock piece
|
|

Terry1
Sun August 19, 2007 3:32pm
|
IRS - Upper Control Arm
Fabricated clevis for 10% shorter, adjustable upper control arm for T-bird IRS
|
|

Terry1
Sun August 19, 2007 3:32pm
|
IRS - Upper Control Arm
Fabricated clevis - 3", 3/16 wall square tube 1-3/4" long
|
|

Terry1
Sun August 19, 2007 3:32pm
|
IRS - Upper Control Arm
Fabricated clevis - 3", 3/16 wall square tube, 1-3/4" long.
|
|

taylor-played
Tue August 26, 2008 9:50am
|
Custom Headers for 87' 302 CID
Fabricated in my shop...
|
|

RJCCOBRA
Thu November 13, 2008 3:17pm
|
Shell Valley build
With help from Buddy Neely, engine mounts, transmission mount, radiator mounts, body mounts, hood latch plates, door striker plates have been fabricated.
|
|

RJCCOBRA
Sun November 23, 2008 5:20pm
|
Shell Valley build
Transmission mount fabricated and custom driveshaft installed.
|
|

RJCCOBRA
Mon December 15, 2008 2:47pm
|
Shell Valley build
Brake lines installed between master cylinders and proportioning valve. A cover was fabricated and installed over the brake/clutch box.
|
|