 
Main Menu
|
Nevada Classics
|
Advertise at CC
|
| S |
M |
T |
W |
T |
F |
S |
| |
|
|
|
1 |
2 |
3 |
| 4 |
5 |
6 |
7 |
8 |
9 |
10 |
| 11 |
12 |
13 |
14 |
15 |
16 |
17 |
| 18 |
19 |
20 |
21 |
22 |
23 |
24 |
| 25 |
26 |
27 |
28 |
29 |
30 |
31 |
|
CC Advertisers
|
|

*13*
Sun May 14, 2006 3:23pm Rating: 10
|
|

boxhead
Sun June 18, 2006 4:36am Rating: 10
|
P1000474
I think this is an old Ford Anglia roadster, It has the left hand door welded closed and body filler in the gaps, Also the rear arches have been moulded to the body and some big flares fitted aswell.
The front of the chassis has what appears to be box section steel welded in place.
I am taking a guess that this is possably an ex speedway car or home made rod of some sort.
Now I have to decide if I want to drag it out and get it home, might look good in the garden?
|
|

Ozgur_Tan
Wed July 12, 2006 10:10pm Rating: 10
|
|

zipzip
Tue July 25, 2006 10:18am
|
|

cobrajeff
Wed August 30, 2006 1:51pm Rating: 10
|
ERA 289 FIA Hybrid
My "Hybrid" 289 FIA with 427 side pipes, roll-bar, hood scoop, and LeMans gas filler in quarter.
|
|

PhilChis
Sun September 3, 2006 8:56pm
|
|

Nvenm8
Mon July 9, 2007 8:49pm
|
|

1985 CCX
Wed November 7, 2007 5:52pm Rating: 10
|
CCX using Enots Aston fuel filler cap - Made in England
|
|

scales
Sun December 2, 2007 12:30pm Rating: 10
|
65_Mustang_Gt350_rough_clone_Medium_
There were gallons of filler in this Mustang. It was all used to form the fiberglass parts to the body. Exellant work, but after years of the Mustang sitting outside it all started to deteriorate and crack.
|
|

scales
Sun December 2, 2007 12:31pm Rating: 5.5
|
65_Mustang_rough_clone3_Medium_
The rear fender flare was removed to check out the work underneith. Lots of filler,fiberglass,and foam. The factory flare was cut out and the metal welded together. No rust, but enough damage to require new quarter panels.
|
|

mickmate
Sun March 9, 2008 7:45pm
|
|

jberg
Wed April 9, 2008 4:13am
|
|

DonC
Sun May 11, 2008 6:40pm Rating: 10
|
|

jeff.nel
Mon May 12, 2008 4:39pm Rating: 10
|
|

RJCCOBRA
Sun November 23, 2008 5:20pm
|
Shell Valley build
Hole cut for gas filler and fuel sender unit.
|
|
|
All times are GMT -7. The time now is 07:59 PM.
Links monetized by VigLink |