
fkemmerer
Sat August 16, 2008 3:20pm Rating: 10
|
ERA #753 - Engine Done
Here are some pictures of our Cobra with the engine installed and the hood back on.
|
|

taylor-played
Tue August 26, 2008 9:38am
|
My Wacky Neighbor ...
Never would get it done without help from my crazy beer guzzlin' pals.....
|
|

bnewell
Sat September 13, 2008 4:09pm Rating: 10
|
|

donraye
Tue October 14, 2008 5:17pm
|
New paint work and plug wires/looms. Done by me 10/08.
I decided to paint the Valve Covers and Air Cleaner to match the car. I then installed new polished wire looms and new yellow 8mm plug wires. Looks sharp I think.
|
|

STCinc
Thu October 16, 2008 9:41pm
|
Brodix Heads
custom machine work done by Lab Machine on Long Island (Lindenhurst NY).
|
|

STCinc
Thu October 16, 2008 9:41pm
|
Dart Iron Block /9.5 deck height
custom machine work done by Lab Machine on Long Island (Lindenhurst NY).
|
|

RJCCOBRA
Tue November 25, 2008 2:59pm
|
Shell Valley build
Holes were cut and the main roll bar hoop installed. Roll bar and down legs were made out of 2 inch DOM .120 wall mild steel tubing. Bending was done by Boyce Industries in Melrose Park, IL.
|
|

RJCCOBRA
Fri December 5, 2008 2:25pm
|
Shell Valley build
We're done painting the frame and have started running the brake lines. Hopefully, tomorrow we'll get the brake lines finished, the rear end mounted, the front suspension with rack and pinion reinstalled, and the gas tank and fuel lines run.
|
|

sganz
Tue December 23, 2008 9:00am
|
More of the Cockpit
After paint, and some more work done
|
|

Baz
Sun January 11, 2009 7:54pm
|
Re-Designed and Re-Positioned brake pedal.
When we originally done the brake pedal, as can be seen in earlier photo, we used the standard size VZ HSV SS Commodore pad on the brake pedal shaft. When it was fitted, it was discovered that there was nowhere to rest or place my left foot, other than on the floor in front of the brake. The pedal shaft was straightened and the pad reduced in size. Now it's perfect.
|
|

RJCCOBRA
Wed January 21, 2009 3:46pm
|
Shell Valley build
The dash panel has been roughed in and the wiring done behind the panel. We need to scroll the edges and make a cover for the slot where the steering column goes through the dash. Then it's on to covering the dash with vinyl.
|
|

Clois Harlan
Mon March 9, 2009 6:32pm
|
Coupe from the side
Bryan Anderson of B&B has done such a wonderful job on the finish of the body...Just wait until we get some paint and some very high end gauges...on the inside.
|
|

767Jockey
Mon March 9, 2009 11:16pm Rating: 10
|
IMG_3333
Rear sway bar almost done.
|
|

cobbindale
Wed April 29, 2009 10:02pm Rating: 10
|
Bogged
Filler done. Almost ready for hi fill
|
|

hsv300
Fri May 22, 2009 4:12pm Rating: 10
|
|