
simon clemens
Sun August 1, 2004 7:07am
|
LHS_extractor
Tacked together.
All equal length.
|
|

simon clemens
Sun August 1, 2004 7:07am
|
LHS_extractor_front
Tacked together.
All equal length.
|
|

simon clemens
Sun August 1, 2004 7:07am
|
LHS_extractor_top
Tacked together.
All equal length.
|
|

Mando
Wed February 23, 2005 1:46am
|
|

Jim Holden
Sat July 9, 2005 7:38pm Rating: 10
|
ERAGT2038
...now gone to California while ERAGT2077 comes together.
|
|

mickmate
Thu June 1, 2006 7:22pm Rating: 9
|
Street Cobra gas tank
Karls tank jigsaw pieces, I hope mine turns out this good I can't wait to put it together. All as per original spec of course except stainless!
|
|

hogster
Wed June 14, 2006 6:25am
|
Big Brakes
Brakes finally arrived and installed. The go cart is starting to come together.
|
|

blueovalfanatic
Sat May 19, 2007 10:42pm
|
wp_pulley
Just had to see how everything would look together.
|
|

Bunkie314
Thu June 7, 2007 9:05pm Rating: 10
|
My Tunnel Port
Short block, heads, and intake together. Getting closer to the dyno jet!
|
|

scales
Sun December 2, 2007 12:31pm Rating: 5.5
|
65_Mustang_rough_clone3_Medium_
The rear fender flare was removed to check out the work underneith. Lots of filler,fiberglass,and foam. The factory flare was cut out and the metal welded together. No rust, but enough damage to require new quarter panels.
|
|

1Cobrat
Wed March 5, 2008 8:16pm
|
All Together. . . .
Finished assembly after interior
|
|

Austin_Snake
Thu April 9, 2009 8:37am Rating: 10
|
Exact 427 White Carbon car
Number 7 going together.
|
|

63mercury
Sun January 24, 2010 11:09am
|
My Cobra Build
The body comming back together.
|
|

Wbulk
Sat May 15, 2010 6:40am Rating: 10
|
Full Roll Bar Home Built
2", .120 wall tubing designed to be chromed. You have to allow for chrome thickness where the tubes slid together. A lot more work than I thought. $175 invested so far. Bending and chrome brought the cost up to about $400.
|
|

Wazza
Tue August 2, 2011 5:49am
|
Not much keeping it all together.
|
|