
nanard289
Sun August 14, 2005 2:29pm
|
Door metal skate
Should be used with the special cam to improve latching operation
|
|

fastraxsg
Fri January 12, 2007 6:35am
|
IMG_7386b
Butt up in the air. Got new Lowell lowered springs but now need to modify chassis so torsion bars don't hit before springs bottom. Had to use spacers to get spring travel but raised body. Major operation required but, now ride is bearable. Local Marvia Cobra, 1989
|
|

fkemmerer
Sat October 4, 2008 2:13pm
|
ERA 753 - Accelerometer
This is a picture of the accelerometer that I've installed in our cobra. It allows the FAST XFI computer in the car to record G forces while the car is in operation.
|
|

mtpockets
Sat November 29, 2008 10:55am
|
|

Ken Williams
Tue March 3, 2009 5:18pm
|
At Operation Comfort
Some of the Texas Cobra Club members went to a Ranch south of San Antonio where disabled Vets from Brooks Army Hospital are being rehabilitated. We gave rides and donated some tools
|
|

Ken Williams
Tue March 3, 2009 5:23pm
|
Operation Comfort, the people
|
|

Ken Williams
Tue March 3, 2009 5:23pm
|
Operation Comfort, the tools
|
|

Wbulk
Fri December 4, 2009 8:59am Rating: 10
|
Clutch Quadrant Modification on B and B
Cut off existing bracket and welded on the extra steel on the left to bolt a modified Ford Racing clutch quadrant to the arm. Much better and smoother operation.
|
|

CowtownCobra
Mon December 21, 2009 5:47am
|
Muddin
Operation Comfort, Elmendorf TX, 12/09
|
|

mtpockets
Sat February 13, 2010 6:04am
|
|

mtpockets
Sat February 13, 2010 6:04am
|
OpCom_Cobra_2
Cobra Build
|
|

RedSnake351
Sat February 26, 2011 6:49pm
|
getting ready for the operation
Scott & Greg getting a transplant
|
|

nanard289
Fri December 30, 2011 1:35pm Rating: 10
|
Building operation - second step
here I cut a 90° aluminum pipe elbow to have two small 40° elbow. This will allow to have a vertical 5° angle
|
|

nanard289
Fri December 30, 2011 1:55pm
|
Step 5
Welding operation is completed, now we have to adjust both intake manifold ports to the head cylinder
|
|

nanard289
Fri December 30, 2011 2:35pm Rating: 9.75
|
Step 7
Building operations are completed. Now is the time to tune the carbs. I had previously a set of Weber 48IDF and I have change to adapt a set of 48 IDA bored at 50mm
|
|