
04-11-2013, 02:39 AM
|
 |
CC Member
|
|
|
Join Date: Jun 2006
Location: Palm Beach,
QLD
Cobra Make, Engine: Harrisons # 62 302 T5
Posts: 474
|
|
Not Ranked
Thanks Gents.
I am in the process of (re)wiring the shed which has 3 phase and will be running a dedicated line from a sub board to hang from the ceiling for the hoist. The extra cost would just be for the cable and outlet. Negligible difference overall.
Regardless, sounds like single phase is plenty so probably no need to go overboard. Just not red.
Geof
__________________
Original? Must be. It's the only one I've ever built.
|