The scissor lift arrived today, but so has a few inches of rain. Bugger! The smaller machinery is getting bogged and it's not a safe or fun option to try to work in the pouring rain and on the increasingly soft site. There goes about $1000 worth of machinery hire down the drain...
It is great to see at least the first frame sitting in the hole, as I can now start to get an appreciation for the scale of the shed. It was a very frustrating day, but also really pleasing to start to see what the shed size is going to look like.