
06-27-2013, 09:38 AM
|
 |
CC Member
|
|
|
Join Date: May 2009
Posts: 237
|
|
Not Ranked
Quote:
Originally Posted by xlr8tr
thanks gang, I will try to catch the fabricator before he finishes: slightly down it will be!
|
Good choice
I had mine vertical - changed them to 45' but changed them very very quickly to approx 10' down ( from vertical) the dust / rocks / ... are a much bigger issue than sound...
Btw. I now have a possibility to change angle on the end of the pipe via a connection ring (that is hidden behind the sheeld)
|