
10-06-2015, 11:59 AM
|
 |
Senior CC Premier Member
|
|
|
Join Date: Nov 2004
Location: SoCal,
CA
Cobra Make, Engine: CSX #4xxx with CSX 482; David Kee Toploader
Posts: 3,574
|
|
Not Ranked
Quote:
Originally Posted by REAL 1
More important than ceiling make sure you have enough thickness for the base and correct cement.
Mohawk makes a stout unit.
|
For my own peace of mind, I would be saw cutting the slab at the anchoring locations. Around 18-24" square and then digging a footing and installing anchor bolts (J-bolts) in the footing along with some minimum 3,000 psi concrete. You can just use a piece of plywood as a template and drill holes to hold the anchor bolts in the correct position while pouring the mud. 
__________________
All that's stopping you now Son, is blind-raging fear.......
|