Preparing tank for replacement.
HTM111 had a alloy skin, plastic tank with foam through-out.
Making a fresh alloy tank via Craig Coombe which will be alloy baffled and new being the same size as to not create other issues.
Seems like the opportune time.
Now to get dimensions to Craig.
As we measured the tank Craig Coombe and I decided to add a drop rear and the beading like 3002.
Dropping the rear of tank, deeper, will add capacity!
Beading; strength a few baffles to keep the gas somewhat level in use. Also adding a drain plug, may make things easier for long term storage situations.