
10-06-2015, 07:37 PM
|
 |
Senior CC Premier Member
|
|
|
Join Date: Nov 2004
Location: SoCal,
CA
Cobra Make, Engine: CSX #4xxx with CSX 482; David Kee Toploader
Posts: 3,574
|
|
Not Ranked
Quote:
Originally Posted by RockBit
Good thought. If I can get the template for the lift before I have the floor poured, it would be better to set the j-bolts than hammer drilling the holes.
|
Make your own template easily. Just put a piece of plywood under the base plate and mark the holes. Then drill the holes in the plywood and double-nut the anchor bolts to it. Drop it into the footing and suspend it with some 1/2 or 3/4" strips across the hole. Center and square it and pour the footing. Just measure, then measure again! 
__________________
All that's stopping you now Son, is blind-raging fear.......
|